Buyer questions
Frequently asked questions about pp woven bags
What should I provide for a custom PP woven bag?
Provide the use, contents, dimensions, gusset, packed load, woven material and surface direction, handles, seams, artwork, labels, reuse requirement, tests, packaging, quantity, market and timing.
What is the difference between PP woven and PP non-woven bags?
They use different substrate constructions and should not be treated as interchangeable. Confirm polymer, fabric or sheet specification, surface construction and required evidence for the exact project.
Can a PP woven bag be laminated and printed?
A laminated and printed direction can be reviewed after the substrate, surface, artwork, colour standard, process and adhesion criteria are defined.
Is every PP woven bag recyclable or eco-friendly?
No. The complete material, coatings, inks, trims, local collection systems, actual reuse and claim method matter. Environmental statements require project-specific evidence.
What is the MOQ and lead time for custom pp woven bags?
MOQ is typically 500–1000 pcs depending on style, and lead time is typically 30–45 days depending on quantity and style. The exact MOQ and lead time are confirmed per quotation, after the specification, materials and branding are fixed.
How can I request a custom pp woven bags sample?
Send a reference, drawing or tech pack with dimensions, materials, construction, branding and intended use. Agree the sample scope, charges, timing and approval criteria before development; sample timing and fees are quoted for the project.
Can I order pp woven bags with my logo or private label?
Share artwork, logo dimensions, position, colours, labels and packaging. Printing and embroidery can be discussed against the selected fabric and construction. Confirm feasibility, artwork ownership and appearance on an approved sample before bulk production.
What affects the production lead time for pp woven bags?
Material availability, construction, quantity, colour splits, branding, sample approvals and the current production schedule affect timing. Confirm the start conditions and dispatch date in the quotation; transit and import clearance require separate planning.